• 01.

    Project Overview
  • 02.

    Customer Needs
  • 03.

    Installation Effect

    The project is primarily implemented on factory rooftops and distributed PV sites across Thailand. The system is designed to support continuous production, handle high electricity demand, and maintain long-term stable operation in complex power environments.

    The client expects the solar PV system to operate reliably in a continuous factory production environment, handle high electricity demand, and provide centralized monitoring and intelligent management of all distributed modules, reducing production downtime caused by faults while improving overall operational efficiency and system availability.

    1. System responds quickly, with average critical fault resolution time reduced by 50%
    2.Module-level operational visibility improved, with energy monitoring capability increased by 70%
    3.Equipment stability reaches 99% under high-temperature and high-humidity conditions
    4.Solar power directly supports approximately 55% of peak electricity demand, reducing production load

Thailand SN Project

SYSTEM

V2.5 Module-Master™ Solution MR

  • 4MWp
    INSTALLED CAPACITY
  • 3500
    INSTALLATION QUANTITY
  • APT-MC-MR-T2
    PRODUCT
  • Thailand
    LOCATION
  • Manufacturing
    INDUSTRY
  • Factory
    INSTALLATION TYPE

Case Gallery

CONTACT US

  • Business cooperation

  • Technical services

  • Join us

  • *
  • *
  • *
  • *
  • *
  • *
  • *