• 01.

    Project Overview
  • 02.

    Customer Needs
  • 03.

    Installation Effect

    AdvanSol successfully completed the delivery of a railway-related PV project in East China. The project is located near a high-speed rail transportation facility in a suburban town, with a total installed capacity of 255.4 kWp. As a PV application supporting transportation infrastructure, the project places high demands on system safety, stability, and remote operation and maintenance capabilities.

    The project owner sought a module-level control solution to enable refined remote management of the PV system. Key requirements included real-time monitoring of module operating status, rapid module-level shutdown when needed, and performance optimization under off-site conditions. The solution also needed to ensure long-term reliability and efficient operation to meet the high standards of transportation infrastructure scenarios.

    1.Module-level control improves PV module output, increasing power generation performance by approximately 15%–20%
    2.Real-time data collection and analysis support intelligent O&M, boosting management efficiency by about 40%
    3.System operates stably over the long term, with failure rate reduced below 1%, significantly enhancing reliability

JinHua GTZ Project

SYSTEM

V2.5 Module-Master™ Solution MRO

  • 255.4KW
    INSTALLED CAPACITY
  • 280
    INSTALLATION QUANTITY
  • APT-MC-MRO
    PRODUCT
  • China
    LOCATION
  • Transportation
    INDUSTRY
  • Municipal
    INSTALLATION TYPE

Case Gallery

CONTACT US

  • Business cooperation

  • Technical services

  • Join us

  • *
  • *
  • *
  • *
  • *
  • *
  • *