• 01.

    Project Overview
  • 02.

    Customer Needs
  • 03.

    Installation Effect

    This project is a large-scale commercial complex PV installation in the Philippines. With a complex rooftop layout, widely distributed modules, and a high-temperature, high-humidity environment with dense foot traffic, the system demands higher standards for module-level safety, monitoring, and operational efficiency. At the same time, the client aims to significantly reduce electricity costs through solar power generation.

    The client requires a solar PV solution capable of handling complex rooftop layouts and high-temperature, high-humidity conditions. The system must enable rapid fault detection, precise operational management, and reliable performance during periods of high foot traffic, while efficiently generating power to reduce overall electricity costs.

    1. Power generation increased by 30%, reducing electricity costs
    2.Safety level improved by approximately 80%, achieving module-level protection and remote shutdown
    3. Operational efficiency increased by about 50%, with intelligent monitoring reducing manual inspections
    4.Stable system operation, with equipment uptime reaching 99.8%

Philippines LCM Project

SYSTEM

V2.5 Module-Master™ Solution MRO

  • 6MWp
    INSTALLED CAPACITY
  • 4600
    INSTALLATION QUANTITY
  • APT-MC-MRO, APT-MC-MRO-120
    PRODUCT
  • Philippines
    LOCATION
  • Commercial & Industrial
    INDUSTRY
  • Shopping Mall
    INSTALLATION TYPE

Case Gallery

CONTACT US

  • Business cooperation

  • Technical services

  • Join us

  • *
  • *
  • *
  • *
  • *
  • *
  • *