• 01.

    Project Overview
  • 02.

    Customer Needs
  • 03.

    Installation Effect

    This case highlights the application of AdvanSol’s MRO series products in a 130 kW rooftop PV project at a hospital in Camarines, Philippines. As a medical facility, the hospital places extremely high demands on power continuity, stability, and electrical safety, as any power interruption may directly impact medical operations and public safety. As a result, system reliability and regulatory compliance were key considerations from the outset of the project.

    The hospital’s core requirements focused on ensuring uninterrupted power supply and the highest level of electrical safety, while also complying with complex building structures and fire safety regulations. The customer sought a module-level solution capable of delivering fast and reliable safety shutdown, minimizing system risks, and improving O&M efficiency to reduce long-term operating costs.

    1.Module-level rapid shutdown reduces voltage to 1V within 30 seconds, significantly enhancing hospital electrical safety
    2.Intelligent O&M and automated fault handling lower operational costs by approximately 50% and improve management efficiency
    3.System complies with building and fire safety regulations, effectively preventing fire, electric shock, and short circuits, ensuring stable power supply

Philippines CDH Hospital Project

SYSTEM

V2.5 Module-Master™ Solution R/MRO

  • 128.62KW
    INSTALLED CAPACITY
  • 250
    INSTALLATION QUANTITY
  • APT-MC-MRO、APT-MC-R-T2
    PRODUCT
  • Philippines
    LOCATION
  • Hospital
    INDUSTRY
  • Hospital
    INSTALLATION TYPE

Case Gallery

CONTACT US

  • Business cooperation

  • Technical services

  • Join us

  • *
  • *
  • *
  • *
  • *
  • *
  • *