    The client is a wholly foreign-owned enterprise (Japanese) producing sewing machines and sewing machine semi-finished products. In the manufacturing environment, the electrical system is complex, with safety risks such as DC arcs and aging wiring. Additionally, the large roof spans and dispersed modules make it difficult for traditional centralized monitoring to accurately locate potential hazards. Under continuous production conditions, the PV system must simultaneously meet multiple requirements: high safety, stable operation, and efficient O&M.

    To ensure uninterrupted production, the customer requires module-level safety protection and precise monitoring, enabling rapid detection and isolation of potential faults, reducing O&M complexity, and ensuring the PV system operates safely and reliably over the long term.

    1.Module-level shutdown and arc detection significantly enhance DC-side safety
    2.Remote monitoring and alerts improve O&M efficiency by approximately 50%+
    3.Fault location efficiency improves by 90%+, ensuring stable system operation

Zhuhai BI Project

SYSTEM

V2.5 Module-Master™ Solution MR

  • 1.5MW
    INSTALLED CAPACITY
  • 1274
    INSTALLATION QUANTITY
  • APT-MC-MR-T2
    PRODUCT
  • China
    LOCATION
  • Manufacturing
    INDUSTRY
  • Factory
    INSTALLATION TYPE