• 01.

    xiangmubeijing
  • 02.

    kehuxuqiu
  • 03.

    anzhuangxiaoguo

    The Philippines JMC project involves the rooftop PV system upgrade of a plastic manufacturing factory. As production scales up and electricity demand grows, the original traditional string system increasingly shows limitations in fire safety, precise management, and energy yield, making it insufficient for sustainable growth. A system-level upgrade is therefore needed to enhance overall performance and long-term value.

    The client seeks to upgrade the existing PV system without disrupting factory operations, enhancing system safety and controllability, enabling more refined generation and operational management, fully unlocking rooftop generation potential, and reducing overall electricity costs.

    1.Safety level improved by 80%, enabling module-level protection and remote shutdown
    2.O&M efficiency increased by 40% through AI-based monitoring
    3.Stable operation with equipment failure rate at 0.2%
    4.Annual generation covers 60% of plant electricity demand, delivering significant energy savings and emission reductions

Philippines JMC Project

casesystem

V2.5 Module-Master™ Solution MR

  • 300KWp
    zhuangjiliang
  • 250
    anzhuangshuliang
  • APT-MC-MR-T2
    casechanpin
  • Philippines
    caseweizhi
  • Manufacturing
    casehangye
  • Factory
    anzhuangchangjing

Case Gallery

CONTACT US

  • Business cooperation

  • Technical services

  • Join us

  • *
  • *
  • *
  • *
  • *
  • *
  • *