• 01.

    xiangmubeijing
  • 02.

    kehuxuqiu
  • 03.

    anzhuangxiaoguo

    The factory has long been engaged in the photovoltaic industry, with solid technical expertise and a well-established rooftop PV system. As production capacity expanded and energy consumption patterns evolved, limitations of the existing traditional string-based system gradually became apparent, particularly in terms of operational safety, refined management, and the ability to fully unlock generation potential. A system-level upgrade was therefore required to enhance overall performance and long-term value.

    The customer sought to upgrade the PV system while preserving the existing plant structure as much as possible. Key objectives included achieving module-level safety shutdown and real-time performance visualization, mitigating energy losses caused by module mismatch, improving overall power generation efficiency, and reducing long-term electricity costs. At the same time, the solution needed to support future intelligent O&M and system scalability.

    1.Module-level real-time monitoring and control increase system stability to over 99%
    2.Remote centralized management replaces on-site O&M, improving operational efficiency by approximately 40%–50%
    3.Module-level optimization and rapid response reduce fault impact, significantly enhancing overall system reliability

ChangZhou ZR Project

casesystem

V2.5 Module-Master™ Solution MRO

  • 500KW
    zhuangjiliang
  • 99
    anzhuangshuliang
  • APT-MC-MR-T2,APT-MC-MRO-120
    casechanpin
  • China
    caseweizhi
  • New Energy
    casehangye
  • Factory
    anzhuangchangjing

Case Gallery

CONTACT US

  • Business cooperation

  • Technical services

  • Join us

  • *
  • *
  • *
  • *
  • *
  • *
  • *